90 complete V162 5.6 MW wind turbines UNUSED
Current ownership: EDPR
Maintained by Vestas and inspected by a world-leading inspection and certification company.
Bid for the whole lot, individual turbines or specific components.
Operation:
Key dates
Online Auction September 30.
Key dates for auxiliar equipment (BoP material): coming soon.
Online auctions to be held in April and May.
Location
Puerto Brisa, Colombia
Vestas V162 5.6 MW Wind Turbines Components
| Components | Description | Quantity |
|---|---|---|
| cooler top CONTAINERS | 47 units used for storage and transportation of key turbine components | 47 |
| AG component CONTAINERS | 90 units containing small parts and accessories required for assembly. Regularly inspected by a certification company. | 90 |
| NACELLES | 90 units, housing the main powertrain and generator components. Stored with protective covers and maintained by Vestas personnel. | 90 |
| HUBS | 90 units, which serve as the central connection between the blades and the main shaft. Subject to world-leading inspection and certification company. | 90 |
| TOWERS (120 m - 5 spans each tower) | 90 towers, each divided into 5 sections, for a total of 450 sections. 120 m tower | 90 |
| BLADES (79.35 m long) | 270 blades, each 79 meters long. Stored in Vestas-owned racks for protection. | 270 |
| PTR powertrain | 90 complete units, including gearbox and generator components. Maintenance performed by Vestas personnel | 90 |
| EnVentus Platform | The EnVentus platform, launched by Vestas in 2019, represents the latest generation of wind turbine technology, integrating more than 40 years of experience and innovation |
Other details
- To ensure the preservation and availability of all components, Vestas follows a structured preventive maintenance protocol, while an external certifier company performs periodic inspections to certify the condition of the assets on behalf of EDPR.
- The material is duly stored at port.
- All available documentation: complete inventory, status reports, technical documentation, etc.
AUXILIAR EQUIPMENT (BoP MATERIAL) ON SALE
- Unused material.
- Stored in different locations:
Puerto Brisa y Uribia -La Guajira- (Colombia). - Top brands: Siemens, WEG, 3M, GE.
Transformers WEG 500/34.5 kV – 72/96/120 MVA, 500/34.5 kV – 96/128/160 MV.
Electrical equipment: switchgear, disconnectors, switches, cabinets, control units.
Cabling: medium and high voltage cable, bare copper and fibre optic. Steel. Joints and Terminals. Transponders and Localisers
Electrical conduit, reinforced pipe and rolls of ducting.
VIRTUAL TOUR
VIDEO
Photo gallery
WIND TURBINES PURCHASING PROCESS
Receipt of applications
Potential buyers will express their interest and sign a confidentiality agreement, after which they will receive general information about the assets and a basic eligibility questionnaire to complete.
2: Qualification and submission of bids
Interested parties may submit offers for:
- The entire batch of 90 wind turbines.
- Individual wind turbines (1, 2, 20 or any other quantity).
- Specific components, such as blades, nacelles or power trains.
Deadline for receipt of bids: August 23
3: Final Online Auction
The selected bids will have access to a data room (with legal, tax and contractual information) and will participate in an online auction structured through the Escrapalia platform, where they will be able to bid for complete lots or individual components, after which the winning bids will be decided.
Expected Final online auction date: 30th September
4: Submission of the binding offer, negotiation and signing of the contract
The winning bidders must present a guarantee of a binding offer, the terms of the contract and payment terms will be negotiated and the sale will be formalised by signing the contract.
Do you want to receive more information?
Contact windenergy.escrapalia.com EN
Formulario de contacto general en inglés